Step 8 Gas Pressure Requirements - Heat & Glo LifeStyle PIER-TVFL Installer's Manual

Table of Contents

Advertisement

The gas line should be
installed by a qualified
service technician.
Step 8
Gas Pressure
Requirements
• At the gas line access hole, use insulation to re-
pack the space around the gas pipe.
• Insert insulation from the outside of the fireplace and
pack the insulation tightly to totally seal between the
pipe and the outer casing.
GAS LINE
ACCESS
Figure 10. Gas Supply Line
Pressure requirements for Heat-N-Glo gas fireplaces
are shown in the table below.
Pressure
Natural Gas
Minimum
Inlet Pressure
Maximum Inlet
14.0 inches
Gas Pressure
Manifold
Pressure
A one-eighth (1/8) inch (3 mm) N.P.T. plugged tapping
is provided on the inlet and outlet side of the gas
control for a test gauge connection to measure the
manifold pressure.
The fireplace and its individual shut-off valve must be
disconnected from the gas supply piping system
during any pressure testing of the system at test
pressures in excess of one-half (1/2) psig (3.5 kPa).
The fireplace must be isolated from the gas supply
piping system by closing its individual shut-off valve
during any pressure testing of the gas supply piping
system at test pressures equal to or less than one-half
(1/2) psig (3.5 kPa).
USE A WRENCH ON
SHUT-OFF VALVE
WHEN TIGHTENING
GAS LINE
MANUAL
SHUT-OFF
VALVE
GAS VALVE
FLEX
CONNECTOR
Propane
5.0 inches
11.0 inches
w.c.
w.c.
14.0 inches
w.c.
w.c.
3.5 inches
10.0 inches
w.c.
w.c.
23

Advertisement