Change Determination Process Workflow - Dell OpenManage Network Manager Client Manual

Web client guide 5.1
Hide thumbs Also See for OpenManage Network Manager:
Table of Contents

Advertisement

Change Determination Process Workflow

Change Manager seeds the Change Determination Process and ProScan group operations. You can
configure this to run on groups of your choosing if you create a new Change Determination Process
group operation.
Compare configura-
tion labels -
"Change Determina-
tion" and "Current"
This process records what is removed, updated or added since it last ran on a scanned device's
configuration. If you run the Change Determination Process on equipment, it first backs up the
devices' configuration(s), and stores those with the Change Determination label.
Initiate Change
Determination
Back up device con-
fig and add it to
label: Change Deter-
mination
Check internal con-
fig changed flag
Yes
Is there a
configuration
change?
Make equipment
change records for
later reporting
Change Determination Process | Change Management – ProScan
No
Copy config in
Change Determina-
tion label to Current
label
Reset internal config
changed flag
End Change
Determination
327

Advertisement

Table of Contents
loading

This manual is also suitable for:

Openmanage network manager 5.1

Table of Contents