Flue Liner Installation; Gas Pipe Pressure Testing; Gas Insert Aeration System; Conversion From Ng To Lp - Regency Sunrise U32SE-NG5 Owners & Installation Manual

U32se sunrise gas insert
Table of Contents

Advertisement

INSTALLATION
FLUE LINER
INSTALLATION
1) Cut the fl ex liner as required.
2) Mark the end of one liner to indicate Inlet.
3) Connect the other end of the above liner to
the inlet side of the termination adaptor, seal
connection with high temperature silicone.
Secure with gear clamp.
4) Connect the 2nd liner to the exhaust side of the
adaptor, seal connection with high temperature
silicone. Secure with gear clamp.
5) Install fl ashing.
6) Insert both liners into chimney, passing through
the damper opening.
7) Install termination cap.
8) Connect the marked end of the liner to the inlet
collar of the vent connector plate marked with
an "I", seal connection with high temperature
silicone. Secure with gear clamp.
9) Connect the 2nd liner to the exhaust collar
marked with an "E", seal connection with high
temperature silicone. Secure with gear clamp.
NOTES:
1) Final gas connection should be made after
unit is in place to avoid damage to line when
pushing the unit into position.
2) Mill-pac may be used instead of high
temperature silicone and screws may be used
instead of gear clamps at connections of liner
to inlet and vent collars.
12
Be careful not to damage thermal insula-
tion when sliding on vent connector plate.
This could cause blockage.
GAS PIPE
PRESSURE TESTING
The appliance must be isolated from the gas supply
piping system by closing its individual manual shut-
off valve during any pressure testing of the gas
supply piping system at test pressures equal to or
less than 1/2 psig. (3.45 kPa). Disconnect piping
from valve at pressures over 1/2 psig.
The manifold pressure is controlled by a regulator
built into the gas control, and should be checked
at the pressure test point.
Note: To properly check gas pressure, both
inlet and manifold pressures should be
checked using the valve pressure ports
on the valve.
1) Make sure the valve is in the "OFF" position.
2) Loosen the "IN" and/or "OUT" pressure tap(s),
turning counterclockwise with a 1/8" wide fl at
screwdriver.
3) Attach manometer to "IN" and/or "OUT"
pressure tap(s) using a 5/16" ID hose.
4) Light the pilot and turn the valve to "ON" position.
5) The pressure check should be carried out with
the unit burning and the setting should be within
the limits specifi ed on the safety label.
6) When fi nished reading manometer, turn off the
gas valve, disconnect the hose and tighten the
screw (clockwise) with a 1/8" fl at screwdriver.
Note: Screw should be snug, but do not
over tighten.
GAS INSERT
AERATION SYSTEM
The burner aeration is factory set but may need
adjusting due to either the local gas supply or
altitude. Open the air shutter for a blue fl ame or
close for a yellow fl ame.
The burner assembly will need to be removed in
order to adjust burner aeration if required. See
steps 1-4 in 'Conversion from NG to LP.
Minimum Air shutter Opening
Glass
Crystals
Natural Gas
3/8"
Propane
1/2"
CAUTION: Carbon will be produced if air shutter
is closed too much.
Note: Any damage due to carboning resulting
from setting the aeration controls improperly
is NOT covered under warranty.
Note: Aeration Adjustment should only
be performed by an authorized FPI
Installer at the time of installation or
service.
U32SE-5 FPI Direct Vent Gas Insert
Ceramic
Stones
1/8"
3/8"

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sunrise u32se-lp5

Table of Contents