Installation - Vulcan-Hart SPER1 ML-52918 Installation & Operation Manual

Electric fryers
Table of Contents

Advertisement

Installation, Operation and Care of
MODEL SPER1 & SPER2 ELECTRIC FRYERS
PLEASE KEEP THIS MANUAL FOR FUTURE REFERENCE
GENERAL
Your Vulcan fryer is produced with quality workmanship and material. Proper installation, usage and
maintenance of your fryer will result in many years of satisfactory performance.
Vulcan-Hart Company suggests that you thoroughly read this entire manual and carefully follow all of
the instructions provided.

INSTALLATION

Before installing, verify that the electrical service agrees with the specifications on the rating plate
located on the inside of the fryer door panel. If the supply and equipment requirements do not agree,
do not proceed with the installation. Contact your dealer or Vulcan-Hart Company immediately.
UNPACKING
This fryer was inspected before leaving the factory. The transportation company assumes full
responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check
for possible shipping damage. If the fryer is found to be damaged, save the packaging material and
contact the carrier within 15 days of delivery.
Open the cardboard box containing component parts and check quantities. For both Models SPER1
and SPER2 there should be (2) baskets, (1) clean-out rod, and (2) basket hangers.
LOCATION
The fryer may be installed at 0" clearance from the back or side walls. Position the fryer for easy
accessibility for service.
— 2 —

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sper2Ml-52918Ml-52919Sper0 frymateMl-52920

Table of Contents