Installation - Vulcan-Hart ECONOFRY EF3 ML-52099 Installation & Operation Manual

Econofry gas fryers
Hide thumbs Also See for ECONOFRY EF3 ML-52099:
Table of Contents

Advertisement

Installation, Operation and Care of
MODELS EF3, EF4 & EF5 ECONOFRY GAS FRYERS
KEEP THESE INSTRUCTIONS FOR FUTURE USE
Your Vulcan-Hart Gas Fryer is produced with quality workmanship and material. Proper installation,
usage and maintenance will result in many years of satisfactory performance.
It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions
provided.
Before installing the fryer, verify that the type of gas (natural or propane) agrees with the specifications
on the fryer data plate which is located on the inside of the door. Also be sure the fryer is built for the
installation elevation.
The fryer must be restrained with adequate ties to prevent tipping when installed in order to avoid the
splashing of hot liquid.
UNPACKING
This fryer was carefully inspected before leaving the factory. The transportation company assumes
full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking the
fryer, check for possible shipping damage. If the fryer is found to be damaged, save the packaging
material and contact the carrier within 15 days of delivery.
Accessories packed in the fry tank include:
Do not use the door or its handle to lift or move the fryer.
GENERAL

INSTALLATION

Crumb Screen
Basket Hanger
(4) Legs
Drain Pipe
(2) Twin Fry Baskets
— 3 —

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ef3Ef4Ef5

Table of Contents