Epson ActionLaser 1300 EPL-3000 Service Manual page 73

Table of Contents

Advertisement

Disassembly and Assembly
High Voltage Supply Board (PWB-F) Removal
3.2.3.5
1. Remove the housing. (Refer to Section 3.2.l.l.)
2. Remove the rear frame. (Refer to Section 3.2.1.2.)
3. Disconnect connectors CN1 and CN2 on thehighvoltage supply board (PWB-F).
4. Remove 3 CPB screws (M3 x 8), and remove the high voltage supply board.
Figure 3-9. Removing the High Voltage Supply Board
3-9
Rev. A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Epl-3000Actionlaser 1300

Table of Contents