4 ] Installing The Mechanical Unit Together With The Cutter-Related Components - Brother PT-2500PC Service Manual

Hide thumbs Also See for PT-2500PC:
Table of Contents

Advertisement

[ 4 ] Installing the Mechanical Unit Together with the Cutter-related Components

(1) While holding up the mechanical unit as illustrated below, connect the head flat
cable (P8) to the main PCB.
(2) Put the mechanical unit into place.
(3) Align the frame edge below the cutter motor with the rib of the bottom cover, then
secure the mechanical unit with the screw.
(4) Secure the grounding wire to the frame with the screw.
(5) Connect the following harnesses to the main PCB:
- Cutter motor harness (P4)
- Cutter sensor harness (P3)
- Tape feed motor harness (P5)
Fig. 2.2-27 Installing the Mechanical Unit
II - 27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents