Chapter 3: Hardware Installations And Upgrades; Before You Begin; Tools And Supplies Needed; Installing And Removing Memory - Intel S5000XVN - Workstation Board Motherboard User Manual

Workstation board
Hide thumbs Also See for S5000XVN - Workstation Board Motherboard:
Table of Contents

Advertisement

3
Hardware Installations and
Upgrades

Before You Begin

Before working with your workstation product, pay close attention to the
Information" on page

Tools and Supplies Needed

Phillips* (cross head) screwdriver (#1 bit and #2 bit)
Needle nosed pliers
• Antistatic wrist strap and conductive foam pad (recommended)

Installing and Removing Memory

The silkscreen on the board for the FBDIMMs displays DIMM_A1, DIMM_A2,
DIMM_B1, DIMM_B2, DIMM_C1, DIMM_C2, DIMM_D1, and DIMM_D2, starting
from the inside of the board. DIMM_A1 is the socket closest to the MCH. See
on page 15
Information and Software" on page viii

Installing FBDIMMs

To install FBDIMMs, follow these steps:
1. Observe the safety and ESD precautions in
2. Turn off all peripheral devices connected to the workstation. Turn off the
workstation.
3. Disconnect the AC power cord from the workstation.
4. Remove the chassis cover. See the documentation that came with your chassis for
instructions on removing the cover.
iii.
for a discussion of the memory requirements and options. See
for a link to the list of tested FBDIMMs.
"Safety Information" on page
"Safety
"Memory"
"Additional
iii.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents