IBM 8646 - Eserver xSeries 220 Hardware Maintenance Manual page 65

Hardware maintenance manual
Table of Contents

Advertisement

The following illustration shows the rear connectors on the hot-swap-drive
backplane, as viewed from the rear of the server.
The following illustration shows how to install a hot-swap hard disk drive in the
server. When you install hot-swap hard disk drives, install them in the following
order: bay 7, bay 6, and bay 5.
Attention:
v When you handle static-sensitive devices, take precautions to avoid damage
from static electricity. For details on handling these devices, see "Handling
static-sensitive devices" on page 114.
v To maintain proper system cooling, do not operate the server for more than 10
minutes without either a drive or a filler panel installed in each bay.
To install a hot-swap hard disk drive in bay 5, 6, or 7, do the following:
1. Review "System reliability considerations" on page 44.
2. Read the information in "Preinstallation steps (all bays)" on page 53.
Note: You do not have to turn off the server to install hot-swap hard disk
drives in these bays.
SCSI cable
connector
SCSI power
cable connector
2
I C cable
connector
Filler panel
Drive tray
assembly
Drive tray handle
(in open position)
Installing options
57

Advertisement

Table of Contents
loading

This manual is also suitable for:

Eserver xseries 220 type 8646

Table of Contents