ZyXEL Communications GS 2200 Manual page 30

Intelligent layer 2 gbe switch
Hide thumbs Also See for GS 2200:
Table of Contents

Advertisement

Chapter 2 Hardware Installation and Connection
Align the holes on the back of the Switch with the screws on the wall. Hang the Switch on the
2
screws.
Figure 7 Wall-mounting Example
The Switch should be wall-mounted horizontally. The Switch's side
panels with ventilation slots should not be facing up or down as this
position is less safe.
The following are dimensions of a self-tapping screw and masonry plug used for wall mounting. All
measurements are in millimeters (mm).
Figure 8 Masonry Plug and 3.5 mm Self-Tapping Screw
30
GS2200-8/24 User's Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents