b) Remove the cuffs.
3.
Install the covers.
4.
Push the covers firmly into place by
applying pressure to the snap-in
hooks.
Place and connect
Remove the struts
1.
Loosen and remove all screws in the
vertical shipping struts.
2.
Remove the transport struts.
Length of hoses and
connection cable
Connection on the left
(~ 105 cm
0 ~ 145 cm
8 ~ 95 cm
@ 60cm ~ 100cm
or
NL
17