10. WATER TEST CIRCULATION SYSTEM

Check all electrical connections.
Make sure all pipe connections to the pump are securely
tightened.
For BodySpa operation, fill the bath to the overflow. For
whirlpool operation, fill to a minimum 2" (5.1cm) above
the top of the highest jets.
Remove the motor/control access panel. Run the
BodySpa for 5 minutes and check the visible harness
(piping) and union connections for leaks. For units with
a whirlpool, operate the whirlpool for 5 minutes, and
check all whirlpool harness (piping) connections for
leaks.
Turn off the BodySpa or whirlpool.
For additional information on BodySpa and whirlpool
operation, see the start-up instructions beginning on
Page 13.

11. COMPLETE FINISH WALL

Install water-resistant wall material for either flush or
alcove installation as follows:
For flush installations: Install water-resistant wall
material to within 1/4" (6mm) of the module edge. Install
desired trim around the unit to conceal the module edge.
Also install trim along the bottom apron edge.
Tape, mud, and finish the water-resistant wall material.
For alcove installations: Install water-resistant wall
material around the unit to conceal the module edge.
Tape, mud, and finish the water-resistant wall material.
AB
114825-2-
2x4 Studs
1/4" (6mm)
Water-Resistant
Gap
Wall Material
2x4
Studs
12
Acrylic
Module
1"
(2.5cm)
x 2"
(5.1cm)
Brace
Trim
Acrylic
Module
1"
(2.5cm)
x 2"
(5.1cm)
Brace
1/4"
(6mm)
Gap
Water-Resistant
Wall Material
Kohler Co., Kohler, WI U.S.A.

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-1051K-1052K-1053

Table of Contents