Installation Requirements; Tools Required; Materials Required; Clearance Requirements - Kohler Maestro K-842-H Installation Instructions Manual

Table of Contents

Advertisement

4. INSTALLATION REQUIREMENTS

A. TOOLS REQUIRED
S Conventional woodworking tools
S Arc pliers or 14" pipe wrench
S Rule
S Level
S Safety shoes
S Safety glasses
S Square
S Screwdriver
S Pliers
S Utility knife
S Tin snips
C. CLEARANCE REQUIREMENTS
Check the roughing-in and room dimensions to provide
adequate available space for the bath unit.

5. SITE REQUIREMENTS

A. OLD BATH REMOVAL
Disconnect the drain at the trap. Remove the old wall
material. Slip boards under the old bath feet to
protect the floor and slide the old bath out of the recess
as illustrated.
B. SUBFLOOR PREPARATION
Check the flooring under the bath, and make repairs as
needed. Make sure the subfloor is level.
BA
113906-2-
(A)
B. MATERIALS REQUIRED
S Plumbers putty
S Wall coverings, as necessary
S Silicone sealant
S 2x4's
S Drop cloth
S Nails
D. NEW OR REPLACEMENT INSTALLATION
REQUIREMENTS
This unit can be installed in new or existing bathrooms.
For new installations: Position the plumbing according
to the roughing-in on Page 4. Cap the supplies, and
check for leaks.
For replacement installations: Remove the old bath.
Remove the old wall material, and remove any old floor
covering from the area. Remove any old plumbing that
does not conform to roughing-in requirements.
Old Bath
6
Floor
Protection
Boards
Kohler Co., Kohler, WI

Advertisement

Table of Contents
loading

This manual is also suitable for:

Maestro k-845-h

Table of Contents