Download Print this page

Installation Requirements; Site Requirements; Before Installing Unit - Kohler EVOK 2.0 25163A-0 Installation Instructions

Seamless freestanding baths

Advertisement

INSTALLATION REQUIREMENTS

A. Tools Required
Adjustable pipe
wrench
Ruler
Level
Safety shoes
Safety glasses
Square
Screwdriver
Pliers
Utility knife
C. Installation Note:
Read the entire installation instruction manual supplied with this bath before beginning the installation. If installing
a rim-mount faucet, make sure there is no interference with the drain overflow before drilling any holes.
D. Clearance Requirements
Check the rough-in and room dimensions to ensure there is adequate available space for the bath.

SITE REQUIREMENTS

A.
Subfloor
Preparation
Check the flooring under the bath, and make repairs as necessary. Make sure the subfloor is level. It is strongly
recommended to prepare a waterproof layer for the subfloor beforehand. It may be necessary to plan for a
channel in the floor to allow space for a trap, see cross section below:

BEFORE INSTALLING UNIT

A. Protect the Bath Unit
Position a protective covering underneath the bath and be careful not to scratch the bath surface.
NOTES:
1. Flush the water supply pipes thoroughly to remove debris.
2. Inspect the supply tubing for damage. Replace as necessary.
3. Observe local plumbing codes.
B. Materials Required
Plumbers putty
Wall coverings(as necessary)
Silicone sealant
3

Advertisement

loading

This manual is also suitable for:

Evok 2.0 25164a-0Evok 2.0 25165a-0Evok 2.0 25166a-0Evok 2.0 25167a-0