Installation Requirements; Tools Required; Materials Required; Clearance Requirements - Kohler Precedence K-1353-AA Installation Instructions Manual

Baths
Table of Contents

Advertisement

4. INSTALLATION REQUIREMENTS

A. TOOLS REQUIRED
S Conventional woodworking tools
S Arc pliers or 14" pipe wrench
S Rule
S Level
S Safety shoes
S Safety glasses
S Square
S Screwdriver
S Pliers
S Utility knife
C. CLEARANCE REQUIREMENTS
Check roughing-in and room dimensions in order to
provide adequate available space for the bath unit.

5. SITE REQUIREMENTS

A. OLD BATH REMOVAL
Disconnect the drain at the trap. Remove old wall
material. Slip boards under old bath feet to protect
floor and slide old bath out of recess as illustrated.
B. SUBFLOOR PREPARATION
Check flooring under the bath and repair if necessary.
Make sure that the subfloor is level. Seal subfloor to
reduce the risk of water damage.
CA
113019-
(1093)
B. MATERIALS REQUIRED
S Plumbers putty
S Water-resistant sealer
S Wall coverings, as necessary
S RTV silicone sealant
D. NEW OR REPLACEMENT INSTALLATION
REQUIREMENTS
This bath unit can be installed in new or existing
bathrooms.
For new installations: Position plumbing according to
roughing-in dimensions located on page 4. Cap supplies
and check for leaks.
For replacement installations: Remove old bath,
remove old wall material and remove old floor covering
from area. Remove old plumbing which does not
conform to roughing-in requirements.
Old Bath
6
Floor
Protection
Boards
Kohler Co., Kohler WI

Advertisement

Table of Contents
loading

This manual is also suitable for:

Precedence k-1354-aa

Table of Contents