Installation Requirements; Tools Required; Materials Required; Clearance Requirements - Kohler Hourglass 30 K-1201 Installation Instructions Manual

Table of Contents

Advertisement

8. INSTALLATION REQUIREMENTS

A. TOOLS REQUIRED
S Conventional woodworking tools
S Arc pliers or 14" pipe wrench
S Rule
S Level
S Safety shoes
S Safety glasses
S Square
S Screwdriver
S Pliers
S Utility knife
S Tin snips
C. CLEARANCE REQUIREMENTS
Check the roughing-in and room dimensions to provide
adequate available space for the bath unit.
EA
113867-2-
(-)
B. MATERIALS REQUIRED
S Plumbers putty
S Wall coverings, as necessary
S Silicone sealant
S Construction adhesive (optional)
S 2x4's
S Drop cloth
S Nails
D. NEW OR REPLACEMENT INSTALLATION
REQUIREMENTS
This unit can be installed in new or existing bathrooms.
For new installations: Position the plumbing according
to roughing-in dimensions beginning on Page 4. Cap the
supplies, and check for leaks.
For replacement installations: Remove the old bath.
Remove the old wall material, and remove any old floor
covering from the area. Remove any old plumbing that
does not conform to roughing-in requirements.
10
Kohler Co., Kohler WI

Advertisement

Table of Contents
loading

Table of Contents