12 Pneumatic connection
11.4 Installation with clamp connections
Fig. 2: Clamp connection
Gasket and clamp!
▶ The gasket and clamps for clamp connections are not in-
cluded in the scope of delivery.
1. Keep ready gasket and clamp.
2. Carry out preparation for installation (see chapter "Prepar-
ing for installation").
3. Insert the corresponding gasket between the body of the
product and the pipe connection.
4. Connect the gasket between the body of the product and
the pipe connection using clamps.
5. Re-attach or reactivate all safety and protective devices.
11.5 Installation with threaded spigots
Fig. 3: Threaded spigots
Thread sealant!
▶ The thread sealant is not included in the scope of deliv-
ery.
Only use appropriate thread sealant.
●
1. Keep thread sealant ready.
2. Carry out preparations for installation (see chapter "Pre-
paring for installation").
3. Screw the pipe into the threaded connection of the valve
body in accordance with valid standards.
ð Use appropriate thread sealant.
4. Re-attach or reactivate all safety and protective devices.
GEMÜ 650TL
NOTICE
NOTICE
12 Pneumatic connection
12.1 Control function
Diaphragm size 8
Diaphragm size 10
28 / 42
Vent hole
Control medium connector 2
Leak detection hole
Vent hole
Control medium connector 2
Leak detection hole
www.gemu-group.com