Port Power Consumption [1-8] - Planet Networking & Communication XGS-6320 Series User Manual

Layer 3 10 gigabit managed ethernet switch
Table of Contents

Advertisement

 Reboot Time (30~180s)
Buttons
: Click it to save changes.
: Click it to reset configuration which doesn't to be saved yet.

4.8.1.9 Port Power Consumption [1-8]

This page shows user per port PoE power consumption status and PoE port setting.
This column allows user to set the PoE device rebooting time, due to there are so
many kind of PoE device on the market and theyhave different rebooting time. The
PD Alive-check is not a defining standard, so the PoE device on the market doesn't
report reboots done information to IGS-6325 PoE Switch, so user has to make sure
how long the PD will be finished to boot, and then set the time value to this column.
System is going to check the PD again according to the reboot time. If ou can not
make sure precisely booting time, we suggest you to set it longer.
Figure 4-8-1-8: Graphical Port Power Consumption
436
User's Manual of XGS-6320 Managed Switches

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xgs-6320-12x4trXgs-6320-8up4xXgs-6320-8x8tr

Table of Contents