Swann AMU-II ph/Redox Operator's Manual page 73

Table of Contents

Advertisement

AMU-II pH/Redox
Program List and Explanations
5.3.2.342
5.3.2.342.1
5.3.2.342.2
5.3.2.342.8
5.3.2.44
5.3.2.54
5.3.2.6
5.3.2.7
5.3.2.1
5.3.4
5.3.4.1
5.3.4.2
5.3.4.3
A-96.150.441 / 230523
Calendar:
Start time: The programmed start time is valid for each of the pro-
grammed days. To set the start time see
Range: 00:00:00–23:59:59
Monday: Possible settings, on or off
to
Sunday: Possible settings, on or off
Run Time: see Interval
Delay: see Interval
Signal Outputs: see Interval
Output/Control: see Interval
Function = Fieldbus:
The relay will be switched via the Profibus input. No further parame-
ters are needed.
Input: The functions of the relays and signal outputs can be defined
depending on the position of the input contact, i.e. no function,
closed or open.
Active: Define when the input should be active:
The measurement is interrupted during the time the input is active.
Input is never active.
No:
Input is active if the input relay is closed
When closed
Input is active if the input relay is open
When open:
Signal Outputs: Select the operation mode of the signal outputs
when the relay is active:
Signal outputs continue to issue the measured
Cont.:
value.
Signal outputs issue the last valid measured value.
Hold:
Measurement is interrupted. Errors, except fatal
errors, are not issued.
Set to 0 or 4 mA respectively. Errors, except fatal
Off:
errors, are not issued.
Output/Control: (relay or signal output):
Controller continues normally.
Cont.:
Controller continues on the last valid value.
Hold:
Controller is switched off.
Off:
5.3.2.341, p.
70.
71

Advertisement

Table of Contents
loading

Table of Contents