12.7 Installation check list

The following checks must be performed once the flow meter is installed in the pipe:
Check
State and specification of device
▪ Flow meter checked for external damage?
▪ Does flow meter meet the specifications of the measuring point
Installation
▪ Does flow direction on flow meter correspond to the actual flow
▪ If not, has the appropriate parameter in the transmitter menu been
▪ Do measuring point number and nameplate labeling match the
▪ Do mounting position and installation match usage (measurement
▪ Is meeting the permissible ambient temperature for the transmitter
Process environment and conditions
▪ Is the flow meter protected from environmental influences
104 / 180
(process fluid temperature, process pressure, ambient
temperature, measuring range, etc.)?
direction in the pipe?
switched?
installation site?
of gas, liquid) in the process environment and under process
conditions?
ensured?
(precipitation, direct insolation)?
A5E52748387-AA, 2023/09
Installation check list
Performed?