Eclipse 1000 User Manual page 28

Hide thumbs Also See for 1000:
Table of Contents

Advertisement

Operating Instructions (continued)
STEP 2: TURN ON THE UNIT AND ALLOW TO WARM UP
Press and hold the
I
your ECLIPSE. A brief self-test will happen. Verify that all the indicators
are lit and a 3-second buzzer sounds, indicating the system is in
working order.
Warm-up Period
I
Oxygen Monitoring
monitoring system with a yellow (alert) and red (alarm) visual indicator and
buzzer. The buzzer will activate in the event of an internal malfunction or power
outage (external power loss with no Power Cartridge installed). The red,
yellow, and green (all OK) indicators will initially light up and then the red
and yellow indicators sequentially go out when the oxygen purity is within
specification.
• After initially turning ON the unit, allow up to five (5) minutes for the unit
to reach its specified performance. The control panel will indicate when
the unit is done warming up. When the green ON indicator is lit, the system
is ready for use.
26 | ECLIPSE
TM
Model 1000
User Manual
Button for one (1) second to turn
"ON/OFF"
- The ECLIPSE Oxygen System has an oxygen
ON
Green light
Yellow light
(ready)
(alert)
Red light
(alarm)

Advertisement

Table of Contents
loading

Table of Contents