Installing Work Clamp; Work Cable Routing Inside Unit - Miller Millermatic 190 Owner's Manual

Table of Contents

Advertisement

5-5. Installing Work Clamp

Tools Needed:

5-6. Work Cable Routing Inside Unit

OM-264761 Page 16
.
A complete Parts List is available on-line at www.MillerWelds.com
2
1
6
5
4
3
2
.
Tighten connection hardware
with proper tools. Do not just
hand tighten hardware. A loose
electrical connection will cause
poor weld performance and ex-
cessive heating of the work
clamp.
1
Work Clamp
2
Work Cable From Unit
3
Screw
4
Flat Washer
5
Lock Washer
6
Nut
Route work cable through hole in
clamp handle. Secure cable with
hardware as shown.
805 460-A
1
Work Cable
2
Output Terminal Block
Work cable is routed through the
small hole in front panel and routed
along base of unit to output terminal
block.
1
Ref. 267 805-A

Advertisement

Table of Contents
loading

Table of Contents