Heat & Glo PIER-36TR-IFT Installation Manual page 25

Hide thumbs Also See for PIER-36TR-IFT:
Table of Contents

Advertisement

Top Vent - Horizontal Termination - (continued)
Three Elbows
V
Minimum
H
1
Elbow only
1 ft.
6 in.
152 mm
3 ft.
1 ft.
305 mm
6 ft
2 ft.
610 mm
10 ft.*
3 ft.
914 mm
12 ft.*
*H
Figure 4.12
Maximum
V
Minimum
1
2
305 mm
6 in.
914 mm
6 in.
1.8 m
1 ft.
3 m
2 ft.
3.7 m
3 ft.
+ H
= 18 ft. (5.5 m) Maximum
1
2
H
2
Heat & Glo • ST-36TR-IFT, PIER-36TR-IFT Installation Manual • 2482-980 Rev. D • 3/19
H
Maximum
2
152 mm
1 ft.
305 mm
152 mm
2 ft.
610 mm
305 mm
6 ft
1.8 m
610 mm
10 ft.*
3 m
914 mm
12 ft.*
3.7 m
V
+ V
+ H
+ H
1
2
1
V
2
H
1
V
+ V
Minimum
1
2
6 in.
152 mm
1 ft.
305 mm
2 ft.
610 mm
4 ft
1.2 m
6 ft
1.8 m
= 50 ft. (15.2 m) Maximum
2
H
+ H
Maximum
1
2
1 ft.
305 mm
3 ft.
914 mm
12 ft.
3.7 m
18 ft.
5.5 m
18 ft
5.5 m
V
1
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

St-36tr-ift

Table of Contents