Heat & Glo PIER-36TR-IFT Installation Manual page 16

Hide thumbs Also See for PIER-36TR-IFT:
Table of Contents

Advertisement

NOTICE: Illustrations reflect typical installations and are
FOR DESIGN PURPOSES ONLY. Illustrations/diagrams
are not drawn to scale. Actual installation may vary due to
individual design preference.
C
D
DVP Pipe SLP Pipe
PIER-36TR-IFT
Rough
Opening
(Width)
Inches
Millimeters
Adjust framing dimensions for interior sheathing (such as sheetrock)
Figure 3.10 Clearances to Combustibles - PIER-36TR-IFT
16
Heat & Glo • ST-36TR-IFT, PIER-36TR-IFT Installation Manual • 2482-980 Rev. D • 3/19
A
B
A
B
Rough
Rough
Rough
Opening
Opening
Opening
(Height)
(Depth)
(Width)
10
9
38-1/8
254
229
968
584
E
H
C
D
E
Rough
Clearance
Combustible
Opening
to Ceiling
(Width)
23
40
31
1016
787
I
G
F
G
H
Combustible
End of
Floor
Flooring
Appliance
0
0
1/2
0
0
13
I
F
I
Sides of
Appliance
36
914

Advertisement

Table of Contents
loading

This manual is also suitable for:

St-36tr-ift

Table of Contents