11 SERVICE WORK ON THE CHASSIS
44
–
Tighten screws
Guideline
Screw, bottom triple
clamp
F02908-10
–
4
Tighten nut
Guideline
Nut, steering head
–
Position the fuel tank breather
F03105-10
–
8
Tighten bolt
Guideline
Screw, steering stem
–
Using a plastic hammer, tap lightly on the upper triple clamp
to avoid stresses.
–
Tighten screws
Guideline
Screw, top triple
F03106-10
clamp
–
Position the brake caliper, and mount and tighten screws
Guideline
Screw, front
brake caliper
–
Position the brake line and the clamp. Mount and tighten
bl
screws
.
Guideline
Screw, brake hose
V02836-11
bracket
Clamp the brake line only via the metal bushing.
Make sure that the upper edge of the bushing is as flush as
possible with the bracket.
Finishing work
–
Check that the wiring harness, throttle cable, and brake and
clutch lines can move freely and are routed correctly.
–
Install front fender. (
–
Install the start number plate. (
–
Install the front wheel.
–
Check the steering head bearing play. (
–
Remove the motorcycle from the lift stand. (
6
.
M8
15 Nm (11.1 lbf ft)
.
M20x1.5
10 Nm (7.4 lbf ft)
7
in the steering stem.
.
M8
20 Nm (14.8 lbf ft)
9
.
M8
20 Nm (14.8 lbf ft)
M8
20 Nm (14.8 lbf ft)
EJOT
1.7 Nm
(1.25 lbf ft)
p. 47)
p. 46)
(
p. 78)
p. 45)
bk
.
Loctite
®
243™
p. 38)