16.
LOCALLY PROCURED PARTS
16-1.
AIR DISCHARGE DUCT
PRECAUTION
All the components/parts such as the duct, frame, and screws are to be locally procured.
●
Do not install the duct where seasonal wind blow directly against to the discharge port.
●
Install so that the static pressure of the air flow path
●
Note that installation of the duct increases the height of the cabinet.
●
If installation space may narrow, like as consecutive unit layout, be sure to fix the duct to the
●
unit before placing the unit.
When the duct is installed, the noise may become louder.
●
DUCT LAYOUT EXAMPLE
Dimension C
(Minimum)
862
●
Make the height A of the duct opening section 500mm or greater.
●
Make the height B of the duct, excluding the flange 500mm or greater.
●
Make the width (dimension C) of the duct within the range of the table shown above.
●
Provide a Chamfer or round the corner at the air flow path.
●
Design the duct weight with 100kg or less as the standard.
●
Design the duct so that maintenance of the motor is possible.
500
(Maximum)
928
Caution
- (02 - 30) -
, including the duct is 33Pa or less.
Chamfer or a round the corner
500
114
1576
(Unit : mm)