INSTALLATION (FOUNDATION)
Install the unit horizontally (within 3 degrees).
Install 4 or more anchor bolts at the 8 locations indicated by arrows (Fig. A).
Place the left and right anchor bolts at a distance further away than 610 mm.
(Excluding the case where anchor bolts are installed at 8 locations.)
To minimize vibration, do not install the outdoor unit directly on the ground. Instead, install it on
top of a firm platform (such as concrete block) (Fig. B).
Keep the height of foundation base over 200 mm from the floor surface (Fig. C).
The foundation base should be able to support the product and the foot width of the product
should be more than 46.5 mm.
Depending on the installation condition, vibration during the operation of the unit may cause
noise and vibration.
Install vibration-proofing materials (such as rubber pads).
Consider the removal space of the connection piping when installing the foundation.
• Secure the equipment firmly with anchor bolts, washers, and nuts.
Fig. A
(Unit : mm)
930
160
610
80
80
Bottom view 8 - 12 x 17 (hole)
Fig. C
Fig. B
No good
160
*Do not use a four-cornersupport foundation.
- (02 - 05) -
OK
OK
More than
200mm
Bolt (M10)