16
Log #5
Install log #5 as shown below. The hole on the bottom of the log rests on the right pin on log #1. The left
end of the log rests on log #2.
Log #6
Install log #6 as shown below. The hole on the bottom of the log rests on the left pin on log #1. The right
end of the log rests on the tip of log #4. The right end of the log should be moved left until it contacts the
side of the log grate finger.
© Travis Industries
Maintenance
4/22/21 - 1514
PB 24 CF GSB2 Operation