Lenovo 7X19 Setup Manual page 42

Hide thumbs Also See for 7X19:
Table of Contents

Advertisement

Figure 27. Cable routing, AnyBay backplane with two processors installed
Table 22. Cables and adapters for routing
PCIe switch card
1
SATA/SAS RAID adapter (8i)
2
Four processors installed
Note: Install the processor and memory expansion tray before connecting the signal cables to NVMe
connectors on the expansion tray (see
ThinkSystem SR850 Setup Guide
34
NVMe signal cables for PCIe switch card
3
SATA/SAS signal cables (720 mm)
4
"Install the processor and memory expansion tray" on page
107).

Advertisement

Table of Contents
loading

This manual is also suitable for:

7x18Thinksystem sr850

Table of Contents