Installation Of The Exv Cable; Piping Installation - Gree GMV-N12U/C-T(U) Owner's Manual

Commercial air conditioners ahu-kit
Table of Contents

Advertisement

AHU-KIT
4.2.3.2 Installation requirements
(1) Ensure that the cable in the control box is in a relaxed state, and both the joint of terminal
and the fixed place of magnetic ring are all not under a stress.
(2) Ensure that the cable sheath port is located in the control box in order to prevent the
rainch.
The quantity of expansion valve coil is determined by the actual number of fittings,The length
of EXV Cable wire is 10m(393-3/4 inch) (24,48,96,192 type) or 2.5m(98-3/8 inch) (12 type).

4.3 Installation of the EXV Cable

Referring to the circuit diagram, then connect the EXV cable to the circuit-board of control box.
Be sure that the cable is fixed firmly in order to ensure a good pull relieve and water protection.

4.4 Piping Installation

When one AHU-KIT is connected to one AHU, the piping installation diagram is as follows:
When several AHU-KITs are connected to one AHU, the piping installation diagram is as
Fig.4.2.2
Fig.4.4.1
24
Fig.4.2.3

Advertisement

Table of Contents
loading

Table of Contents