Exv Installation - Gree GMV-N12U/C-T(U) Owner's Manual

Commercial air conditioners ahu-kit
Table of Contents

Advertisement

(6) Maintenance space of EXV box:

4.2 EXV Installation

4.2.1 Mechanical Installation
(1) Remove the EXV box cover by unscrewing screws.
(2) Drill 4 holes on correct position (measurements as indicated in figure below) and fix the
valve kit box securely with 4 screws through the provided holes φ12mm(1/2 inch).
① Make sure that the EXV box is installed upwards.
② Make sure there is enough free space in front and in the side of the box for future maintenance.
Fig.4.1.6
NOTICE
21
AHU-KIT
Unit: mm(inch)

Advertisement

Table of Contents
loading

Table of Contents