4.5 Installation of the Control Box

(1) Fix the control box with its hanger brackets to the mounting surface.
(2) Open the lid of the control box.
(3) For electrical wiring: refer to the following contents.
(4) Install the screw nuts.
(5) Close the unnecessary openings.
(6) Close the lid securely after installation to ensure that the control box is watertight.
4.5.1 Wire connection of single AHU-KIT control part
NOTICE
① Pull the wires inside through the screw nut and close the nut firmly in order to ensure a
good pull relieve and water protection.
② The cables require an additional pull relief. Fixing the cable with the wire clamp.
Fig.4.5.1