Install Four Post Slider Into Eia/Ansi Rack - Cisco NCS 1001 Hardware Installation Manual

Hide thumbs Also See for NCS 1001:
Table of Contents

Advertisement

Install Cisco NCS 1001
3
Step 6
As soon as the chassis is completely inserted, fasten the chassis with two screws (48-101524-01) on each side
of the bracket and tighten them to a torque value of 3.4 N-m (30 in-lbs).
Caution

Install Four Post Slider into EIA/ANSI Rack

Procedure
Step 1
Identify the four post slider.
Figure 20: Four Post Slider Identification
1
2
Step 2
Prepare the four post slider.
Slider fixing screws (part number - 48-101524-01).
The sliding rail must be used only during the first mounting process and it serves only to push
the chassis into the rack and not for sliding purpose. The chassis must be fixed with screws on
the front side.
Check for the left/right marking on the sliders. This is left front sliding rail.
Check for the left/right marking on the sliders. This is left rear sliding rail.
Install Four Post Slider into EIA/ANSI Rack
Hardware Installation Guide for Cisco NCS 1001
23

Advertisement

Table of Contents
loading

Table of Contents