Operator Station
CAUTION
To avoid damaging circuit board when servicing, wear
grounding strap on wrist and ground appropriately.
Replacing Circuit Board
1.
Follow
Before Servicing
2.
Remove 4 screws (212) and lockwasher (213), and
remove cover (202).
3.
Disconnect cable connector (219) from circuit
board (206).
4.
Remove 4 screws (210) and circuit board (206).
5.
Install new circuit board (206) with 4 screws (210).
6.
Connect cable (219).
7.
Install cover (202) with 4 screws (212).
8.
Turn EasyKey™ power on to test operation.
210
F
. 11
IG
310653B
procedure, page 14.
219
206
TI4869a
202
213
212
Smart Fluid Panel
•
Preparation
•
Replacing Control Board
•
Replacing Air Flow or Pressure Switch
•
Replacing Solenoids
•
Reassemble Smart Fluid Panel
Preparation
WARNING
Read warnings, page 6.
1.
Follow
Pressure Relief
2.
Close main air shutoff valve on air supply line and
on ProMix™ II.
3.
Shut off ProMix™ II power (0 position). F
F
. 12
IG
4.
Loosen the 4 screws (16), then remove the Smart
Fluid Panel cover (15). F
F
. 13
IG
Service ◆ Operator Station
Procedure, page 8.
. 12.
IG
0 = OFF
. 13.
IG
15
16
19