Kohler K-22250T-130 Installation Instructions Manual page 16

Floor standing toilet
Table of Contents

Advertisement

B. Floor Discharge Installation Method
B.
1. Three discharge pipe installation methods based on actual
situation: A, B, C, adjust position by screw driver. Snap
discharge pipe lower end into discharge port.
1.
2. Tighten the long screw into the holes of the tank bracket
and cover the drainage hole with the big cap, cover the
inlet hole with the small cap.
2.
3. Connect tap water braided tube on the top of water tank for
water supply as shown.
Note: 1. Ensure water tank internal valve is OFF.
2. Suggestion: connect a temporary rubber or plastic
hose on valve, flush water supply pipeline. Ensure
water is clean, no residual sand stone or fouling
inside pipeline.
3.
1.
2.
1288805-T01-B
Discharge
Elbow
A B C
Discharge
Elbow
Discharge
Elbow
Drainage Hole
-8-
A
B
C
Inlet Hole
Big Cap
Water Pipe
Connecting Pipe
Water Tank
Bracket
Drain outlet
90mm, welding
90mm
Water Tank
Bracket
Drain outlet
110mm
110mm
Water Tank
Bracket
Drain outlet
110mm, welding
110mm
Tank Bracket
Small Cap
Long Screw

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-22250t-150K-24256k-hc

Table of Contents