Kohler K-22250T-130 Installation Instructions Manual page 15

Floor standing toilet
Table of Contents

Advertisement

3. Drill four holes with diameter of 10mm and depth of 80mm
with churn drilling as shown.
A. Fill the bulge nail into the instruction hole on the wall, fix
the fixing frame to the bulge nail, adjust the gasket and
tighten the nut.
B. Fill the bulge nail into the instruction hole, fix the
adjustable bracket to the bulge nail, adjust the gasket
and tighten the nut.
3.
A B
A.
B.
4. Tighten the nut with the wrench as shown in illustration A.
Tighten the nut with the wrench as shown in illustration B.
4.
A
B
Connect with overflow pipe on the side when installing
K-20009K-PNE/K-20011K-PNE.
K-20009K-PNE/K-20011K-PNE
1288805-T01-B
10mm 80mm
-7-
Bulge Screw
Gasket
Nut
A
Nut
Gasket
Adjustable Bracket
Bulge Screw
B
Wrench
Nut
A
Wrench
Nut
B
Overflow Pipe
Mounting
Bracket

Advertisement

Table of Contents
loading

This manual is also suitable for:

K-22250t-150K-24256k-hc

Table of Contents