Dell PowerEdge R6615 Installation And Service Manual page 85

Table of Contents

Advertisement

NOTE:
Follow the sequential order as shown in the table to remove the cables, to install the cables follow the reverse
sequential order.
Table 66. 4 x 3.5-inch SAS3/SATA RAID
Order
From
1
SIG_PWR_1 (system board power connector)
2
SL1 (signal connector on system board)
NOTE:
Follow the sequential order as shown in the table to remove the cables, to install the cables follow the reverse
sequential order.
Figure 50. 8 x 2.5-inch NVMe
NOTE:
Follow the sequential order as shown in the table to remove the cables, to install the cables follow the reverse
sequential order.
Table 67. 8 x 2.5-inch NVMe
Order
From
1
SIG_PWR_1 (system board power connector)
2
SL1 (signal connector on system board)
3
SL3 (signal connector on system board)
4
SL7 (signal connector on system board)
5
SL8 (signal connector on system board)
To
BP_PWR_1 (backplane power connector)
CTRL_DST_PA1 (front PERC)
To
BP_PWR_1 (backplane power connector)
BP_DST_PA1 (backplane signal connector)
BP_DST_PB1 (backplane signal connector)
BP_DST_PA2 (backplane signal connector)
BP_DST_PB2 (backplane signal connector)
Installing and removing system components
85

Advertisement

Table of Contents
loading

Table of Contents