Moving the drive

Frames R5...R8: Move the transport package by pallet truck to the installation site.
Unpacking and examining delivery, frames R0...R2
The figure below shows the drive package and its contents. Make sure that all
items are present and there are no signs of damage. Read the data on the type
designation label of the drive to make sure that the drive is of the correct type.
See section
Type designation label (page
1
Drive transport package
2
Drive body (the figure shows frame size R1)
3
A plastic bag with installation accessories is below the drive cover plate
4
Multi-language quick installation and start-up guide
5
User manual (if any, adopt additional code for ordering)
6
Basic panel (provided as default panel)
1
Mechanical installation 55