Nortel Meridian Mail Installation Quick Reference Manual page 76

Modular option ec
Hide thumbs Also See for Meridian Mail:
Table of Contents

Advertisement

6-16
Installing the tape drive
Standard 1.0
Step Action
1
Turn off the shelf breakers (on an AC module) or module power
supply switches (on a DC module).
2
Set the SCSI ID properly on the tape drive. See Chapter 4.
3
Install the tape drive in slot MSU1. See the illustration that
follows this procedure.
Modular Option EC Installation Quick Reference Guide
Installing a two-node system
Location of the printed circuit packs

Risk of electrocution
Before installing the tape drive in an AC
module, ensure that shelf breakers are
OFF.
Before installing the tape drive in a DC
module, ensure that the module power
supply switches are OFF.
 
Risk of equipment damage
Wear an antistatic wrist strap when
handling tape drives. As an additional
safety measure, handle drives by the
edges and, whenever possible, with the
loosened packing material still around the
drive.
Tape drives are susceptible to damage
from rough or improper handling.
November 1999

Advertisement

Table of Contents
loading

Table of Contents