GAS BOILER SYSTEM COMMISSIONING CHECKLIST & WARRANTY VALIDATION RECORD
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME):
Company name:
Company email:
Heating and hot water system complies with the appropriate Building Regulations?
Optional: Building Regulations Notification Number (if applicable):
Time, temperature control and boiler interlock provided for central heating and hot water
Boiler Plus requirements (tick the appropriate box(s))
Boiler Plus option chosen for combination boiler in ENGLAND
Time and temperature control to hot water
Zone valves
Thermostatic radiator valves
Automatic bypass to system
Underfloor heating
Water quality
The system has been flushed, cleaned and a suitable inhibitor applied upon final fill, in accordance with BS7593 and boiler manufacturers' instructions
What system cleaner was used?
What inhibitor was used?
Primary water system filter
CENTRAL HEATING MODE measure and record (as appropriate)
Gas rate (for combination boilers complete DHW mode gas rate)
Central heating output left at factory settings?
If no, what is the maximum central heating output selected?
Dynamic gas inlet pressure
Central heating flow temperature
Central heating return temperature
System correctly balanced/rebalanced?
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
Water scale reducer/softener
What type of scale reducer/softener has been fitted?
Water meter fitted?
If yes- DHW expansion vessel
Pressure reducing valve
DOMESTIC HOT WATER MODE Measure and record
Gas rate
Dynamic gas inlet pressure at maximum rate
Cold water inlet temperature
Hot water has been checked at all outlets
CONDENSATE DISPOSAL
The condensate drain has been installed in accordance with the manufacturers' instructions and/or BS5546/BS6798
Point of termination
Method of disposal
ALL INSTALLATIONS
At max rate:
Record the following
At min rate (where possible)
Where possible, has a flue integrity check been undertaken in accordance with manufacturers' instructions, and readings are correct?
The operation of the boiler and system controls have been demonstrated to and understood by the customer
The manufacturers' literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's signature
Customer's signature
(To confirm satisfactory demonstration and receipt of manufacturers' literature)
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
Gas Safe registration number:
Telephone number:
Company address:
Weather compensation
Load compensation
Cylinder thermostat and programmer/timer
pre-existing
pre-existing
pre-existing
pre-existing
Brand:
Brand:
pre-existing
pre-existing
Brand:
pre-existing
pre-existing
CO
ppm
CO
ppm
Smart thermostat with automisation and optimisation
Fitted
Fitted
Fitted
Fitted
Fitted
m
hr
or
3/
Yes
Yes
Fitted
Product:
Yes
Fitted
Fitted
m
hr
or
3/
Yes
Temperature
Internal
External (only where internal termination impractical)
Gravity
CO
%
CO/CO
2
CO
%
CO/CO
2
Commissioning date:
Yes
Yes
Flue Gas Heat Recovery
Combination boiler
Not required
Not required
Not required
Not required
Yes
Product:
Product:
Not required
No
Yes
No
Not required
No
Not required
Not required
Pumped
2
2
Yes
Yes
Yes
www.centralheating.co.uk
ft
/hr
3
kW
mbar
°C
°C
ft
/hr
3
mbar
°C
°C
Yes
Ratio
Ratio