Biasi RINNOVA ADAPTIVE 30S User Manual And Installation Instructions page 6

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for RINNOVA ADAPTIVE 30S:
Table of Contents

Advertisement

You must ensure that you remove the transit caps and plugs from the boiler connections
which are fitted to every boiler.
Keep the boiler clear of dust during installation and in particular do not allow any dust or
debris to enter the top of the boiler where the flue connection is made. It is recommended
that you put a dust sheet over the top of the boiler until you are ready to make the flue
connection.
Remember to release the auto air purge valve on the pump assembly before filling the
boiler. See the instructions to identify the location of this device.
This boiler allows you to control the flow temperature of the central heating system at very
low levels. For underfloor heating system a temperature limiting device (e.g. a safety ther-
mostat) is recommended to stop the boiler in case that the water temperature exceeds
the design temperature.
You are strongly advised to flush out the system both hot and cold in order to remove any
system and installation debris to the British Standard BS 7593 code of practice.
It is also sensible to initially fire and commission the boiler before connecting any external
controls such as a room thermostat. By following this procedure, if you have a subse-
quent problem this method can eliminate the external controls from your fault analysis.
Some products incorporate an anti cycling time delay. It is normal when first switching the
boiler on for the boiler to operate on heating for a few seconds then switch off. After 3 - 4
minutes has elapsed the boiler will then re ignite and operate perfectly normally.
If you are in any doubts as to the installation or operation of the boiler please read the
instruction manuals thoroughly and then if necessary contact Biasi UK for advice and as-
sistance.
Guarantee conditions.
The guarantee registration form must be returned within 30 days of purchase, failure to
comply will invalidate the guarantee.
Electrodes disclaimer. Note to service engineers: It is required that the burner seal, lip
seal and mixing chamber seal along with the flame detection electrode are inspected
every year and replaced every 24 months. Failure to inspect the flame detection probe,
seals and replace as required may render the guarantee void.
Please remember that if you are in any doubt about the installation of this product you can
contact our Technical Help line on tel. 01922 714 600.
Appliance category: II2H3P (gas G20 20 mbar, G31 37 mbar)
Country of destination: United Kingdom (GB) Ireland (IE)
This appliance conforms with the following EEC directive:
Regulation (EU) 2016/426 on appliances burning gaseous fuels
Efficiency Directive 92/42/EEC
Electromagnetic Compatibility Directive 2014/30/EU
Low Voltage Directive 2014/35/EU
Ecodesign Requirements Directive 2009/125/EC
The manufacturer, in the continuous process to improve his products, reserves the right to modify the data expressed
in the present documentation at any time and without prior notice.
The present documentation is an informative support and it can not be considered as a contract towards third parties.
- 6 -
Installing the boiler...

Advertisement

Table of Contents
loading

This manual is also suitable for:

M300v.30 sr41-583-39

Table of Contents