Gas Boiler System Commissioning Checklist - Biasi RIVA PLUS HE 24C ERP User Manual And Installation Instructions

Wall hung, fanflue, roomsealed, high efficiency gas boiler
Hide thumbs Also See for RIVA PLUS HE 24C ERP:
Table of Contents

Advertisement

GAS BOILER SYSTEM COMMISSIONING CHECKLIST

This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failuretoinstallandcommissionaccordingtothemanufacturer'sinstructionsandcompletethisBenchmarkCommissioningChecklistwillinvalidatethe
warranty.Thisdoesnotaffectthecustomer'sstatutoryrights.
Customername:
Address:
Boilermakeandmodel:
Boilerserialnumber:
Commissionedby(PRINTNAME):
Companyname:
Companyaddress:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*
BuildingRegulationsNotificationNumber(ifapplicable):
CONTROLS(ticktheappropriateboxes)
Timeandtemperaturecontroltoheating
Timeandtemperaturecontroltohotwater
Heatingzonevalves
Hotwaterzonevalves
Thermostaticradiatorvalves
Automaticbypasstosystem
Boilerinterlock
ALL SYSTEMS
ThesystemhasbeenflushedandcleanedinaccordancewithBS7593andboilermanufacturer'sinstructions
Whatsystemcleanerwasused?
Whatinhibitorwasused?
Hasaprimarywatersystemfilterbeeninstalled?
CENTRAL HEATING MODE measureandrecord:
Gasrate
Burneroperatingpressure(ifapplicable)
Centralheatingflowtemperature
Centralheatingreturntemperature
COMBINATION BOILERS ONLY
Istheinstallationinahardwaterarea(above200ppm)?
Ifyes,andifrequiredbythemanufacturer,hasawaterscalereducerbeenfitted?
Whattypeofscalereducerhasbeenfitted?
DOMESTIC HOT WATER MODEMeasureandRecord:
Gasrate
Burneroperatingpressure(atmaximumrate)
Coldwaterinlettemperature
Hotwaterhasbeencheckedatalloutlets
Waterflowrate
CONDENSING BOILERS ONLY
Thecondensatedrainhasbeeninstalledinaccordancewiththemanufacturer'sinstructionsand/orBS5546/BS6798
ALL INSTALLATIONS
Recordthefollowing:
TheheatingandhotwatersystemcomplieswiththeappropriateBuildingRegulations
Theboilerandassociatedproductshavebeeninstalledandcommissionedinaccordancewiththemanufacturer'sinstructions
Theoperationoftheboilerandsystemcontrolshavebeendemonstratedtoandunderstoodbythecustomer
Themanufacturer'sliterature,includingBenchmarkChecklistandServiceRecord,hasbeenexplainedandleftwiththecustomer
CommissioningEngineer'sSignature
Customer'sSignature
(Toconfirmsatisfactorydemonstrationandreceiptofmanufacturer'sliterature)
* A llinstallationsinEnglandandWalesmustbenotifiedtoLocalAuthorityBuildingControl(LABC)eitherdirectlyorthrougha
CompetentPersonsScheme.ABuildingRegulationsComplianceCertificatewillthenbeissuedtothecustomer.
©HeatingandHotwaterIndustryCouncil(HHIC)
Roomthermostatandprogrammer/timer
Load/weathercompensation
Cylinderthermostatandprogrammer/timer
Atmax.rate:COppm AND
Atmin.rate:(wherepossible)COppm AND
Telephonenumber:
GasSaferegisternumber:
Telephonenumber:
Commissioningdate:
Fitted
Fitted
Fitted
Fitted
m³/hr
OR
ORGasinletpressure
mbar
m³/hr
OR
mbar ORGasinletpressureatmaximumrate
CO/CO ²
CO/CO ²
Programmableroomthermostat
Optimum start control
CombinationBoiler
Notrequired
Notrequired
Notrequired
Notrequired
Provided
Yes
Quantitylitres
Yes
No
mbar
Yes
No
Yes
No
mbar
Yes
Temperature
Yes
Ratio
Ratio
Yes
Yes
Yes
Yes
www.centralheating.co.uk
www.centralheating.co.uk
ft³/hr
°C
°C
ft³/hr
°C
°C
I/min

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Riva plus he 28c erp

Table of Contents