5.4.2.2
Project configuration
In the "Project configuration" operating area, you can adapt the settings for the currently open
project, including the installation type, robot manufacturer, and number of robots.
1
①
Basic functions:
Close project
Save project
Save project as
②
Setting of the installation mode:
•
First commissioning:
Installation of a robot on a generally reset controller.
•
First commissioning with machine tool:
The 1st channel is reserved for the machine tool. The robot can be installed in a channel ≥ 2. The NC automatically
creates a 1st channel, including the standard axes. After the installation with the CMC expert script ("*.usz"), you
must configure the 1st channel individually.
③
Selection of the robot manufacturer
④
Setting of the measuring unit (metric or inches)
⑤
Specification of the number of robots
SINUMERIK Run MyRobot /Direct Control
Commissioning Manual, 07/2020, A5E45238414B AD
Commissioning
5.4 Robot configurator
2
3
4
5
6
7
8
9
39