References
Further information on the measures can be found in the following manuals:
• SINAMICS Low Voltage Engineering Manual (V6.5)
• EMC Installation Guideline Configuration Manual / Basic system requirements (01/2012)
SINUMERIK Run MyRobot /Direct Control
Commissioning Manual, 07/2020, A5E45238414B AD
4.2 Configuration of a SIZER project
Configuring
29