Monitoring The Project - Mitsubishi Electric FX Series Training Manual

Programmable logic controllers
Hide thumbs Also See for FX Series:
Table of Contents

Advertisement

Building a Project

Monitoring the Project

4.4
Ensure that the PLC is switched to RUN and no errors are present.
Display the body of the MAIN ladder program.
Click on the Monitor Mode Icon
NOTE
Depending on the colour attributes set, monitored variables will be displayed with a coloured
surround (Default: Yellow). Values of any analogue variable will be displayed on the moni-
tored networks as appropriate.
Training Manual GX IEC Developer
on the toolbar and observe the ladder display:
Monitoring the Project
4 - 43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents