Pcb - Canon imageCLASS D600s Service Manual

Hide thumbs Also See for imageCLASS D600s:
Table of Contents

Advertisement

Power switch ON
or
Reader unit in initial position
(at power-on)
Wait
Period
Definition
WAIT
From when the power
(wait)
is turned on until
when the application
of the primary charg-
ing AC bias is started
and stopped.
STBY
From when WAIT
(standby)
ends to when a print
command is received
by the DC controller
PCB through the
video I/F.
INTR
From when a print
(initial
command is received
rotation)
until the leading edge
sensor detects the
leading edge of paper.
PRINT
From when the lead-
(print)
ing edge sensor de-
tects the leading edge
of paper to 1.5 sec
after it detects the
trailing edge of paper.
LSTR
From when printing
(last
ends until the main
rotation)
motor stops.
COPYRIGHT © 2001 CANON INC.
Chapter4.p65
End of printing
Standby
Initial rotation
F04-101-03
Purpose
The machine's mechanical
and electrical states are
checked.
The machine is ready for a
print command.
The machine starts up pro-
cess conditions and picks up
paper for printing.
The DC controller PCB gen-
erates the BD0* signal, and
the image process PCB sends
VD0* signal and VD0 signal,
thereby forming a latent im-
age on the photosensitive
drum and turning it into a
toner image.
The drum surface is made
free of potential and the
transfer charging roller is
cleaned.
T04-101-01
CANON imageCLASS D600s/PC1060s/PC1200s/iR1200s REV. 0 SEPT. 2001
3
CHAPTER 4 OPERATION
If a print command is received
during last rotation
Print
If continuous printing is selected
Remarks
A check is made on the presence/
absence of a cartridge and for pa-
per remaining inside the machine.
The machine also shifts to WAIT
state if the reader unit is returned
while power is supplied.
If a shift is from last rotation of
printing on LTR or larger, the fix-
ing heater is subjected to rest heat-
ing temperature control for 5 sec.
The fixing heater is subjected to
temperature control (start-up tem-
perature control, paper passage
temperature control); scanner rota-
tion speed adjustment and ATVC
control are executed.
After last rotation, the machine shifts
to standby to wait for a print com-
mand, in response to which it immedi-
ately shifts to initial rotation.
8/26/01, 3:44 PM
Last rotation
4-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pc1060sPc1200sIr1200s

Table of Contents