Download Print this page

Daikin MKM24PV2S Service Manual page 24

5.6/6.2/6.5/7.5/8.0/9.0 kw class, 24000/28000 btu/h class

Advertisement

Four Way Valve
Step
2
Remove the terminal
cover.
3
Remove the protection
bushing.
4
Disconnect the
compressor lead wires
and the overload
protector.
5
Remove the putty.
6
Heat up the 4 brazed
parts and remove the
four way valve.
22
Procedure
Terminal
cover
Protection bushing
Overload
protector
Putty
(R22503)
U (red)
V (yellow)
W (blue)
(R22504)
Four way valve
Brazed part
(R22505)
Si121561E
Points
Removal Procedure

Hide quick links:

Advertisement

loading