Download Print this page

Daikin Modular T Installation Manual

Digital node
Hide thumbs Also See for Modular T:

Advertisement

Quick Links

Modular T
Modular T Smart ABT
Traduzione delle istruzioni originali
Traduzione delle istruzioni originali
Manuale di installazione
Installation manual
uso e manutenzione
Digital Node
Modular T Smart ATB
Modular T
D-EIMOC2009-27_00EN
REV
DATE
REPLACES
00
December 2022

Advertisement

loading

Summary of Contents for Daikin Modular T

  • Page 1 Manuale di installazione Installation manual uso e manutenzione Digital Node Modular T Smart ATB Modular T D-EIMOC2009-27_00EN Modular T Modular T Smart ABT DATE December 2022 Traduzione delle istruzioni originali Traduzione delle istruzioni originali REPLACES...
  • Page 2: Important Warnings

    Important warnings The pictogram shows a situation of immediate danger or a dangerous situation that might cause injuries or death. The pictogram shows that it is necessary to adopt suitable behaviour in order to avoid jeopardising staff safety and cause damages to the equipment. The pictogram shows particularly important technical information that should be taken into consideration by the people installing or using the equipment.
  • Page 3: Installation

    Installation Right Handling Left handling VERSION MACHINES VERSION MACHINES ATB**R** ATB**L** air ducts (not supplied) DIGITAL NODE DUCT Exhaust air Fresh air Return air Supply air Box Digital Node position...
  • Page 4 Components Component Q.ty Digital Node Connector bus + power supply digital PCB QE Metal plate Washer 5x15x1.5 8.8 Zinc plated full thread cap screw 4,8x13 Drilling screw, round head with H recessed head...
  • Page 5 Box Digital Node mounting Remove Box Digital Node cap Mounting metal plate and Box Digital Node...
  • Page 6 provided Connect according to the wiring diagram Association of cables with terminal blocks: red-61 black - 62 white - 63 brown-64 green - 65 black (shielding) - 66 Connect Box Digital Node...
  • Page 7 BUS-IN BUS-OUT Position of pressure transducer P1 and P2 Connect Box Digital Node...
  • Page 8 Perform accessory wiring, if required Repositioning Box Digital Node cap LED1 = green ON LED2 = red Hardware error, replace the board LED3 = yellow I/O error, incorrect wiring indicated by the controller LED4 = blue communication OK LED5 = yellow communication timeout with the controller LED6 = red unit in alarm state Status LED...
  • Page 10 La presente pubblicazione è redatta solo come supporto tecnico e non costituisce impegno vincolante per Daikin Applied Europe S.p.A. Daikin Applied Europe S.p.A. ne ha compilato il contenuto al meglio delle proprie conoscenze. Nessuna esplicita o implicita garanzia è data per la completezza, precisione, affidabilità...