Connecting The Cable; Installation - Siemens SINAMICS S220 Equipment Manual

Booksize power units
Hide thumbs Also See for SINAMICS S220:
Table of Contents

Advertisement

Accessories
6.2 Accessories for Smart Line Modules
6.2.1.4

Connecting the cable

1. Starting with W1, V1, U1, insert the insulated conductors into the open terminals.
– Ensure that the insulated conductors are inserted as far as they will go.
– For larger cross-sections, it is helpful if U1, V1, W1 are simultaneously inserted and
2. Insert the protective conductor into the open terminals. Alternatively, you can connect the
protective conductor at the housing.
3. Tighten the screws with a tightening torque of 1.2 ... 1.5 Nm (18 lbf in). Screwdriver: Slotted
1.0 x 5.5 mm
6.2.1.5

Installation

Insert the plug
1. Insert the plug into connection socket X1 at the Smart Line Module until it snaps into place.
The plug has been completely inserted once you hear it snap into place.
2. Secure the cable using a cable tie to provide strain relief. For more information about
shielding, see Chapter "Shield connection plate and terminal (Page 96)".
94
secured by screws.
Equipment Manual, 01/2022, 6SL3097-6AC30-0BP0
Booksize power units

Advertisement

Table of Contents
loading

Table of Contents