New Holland T8010 Manual page 59

Hide thumbs Also See for T8010:
Table of Contents

Advertisement

STEP 27
Install and tighten two bolts through each of the two
lockdown plates.
STEP 28
Install the pressure equalization hose on the top front
of the left tank. Tighten clamp.
STEP 29
Install the fuel vent hose (1) and reposition the hose
clip.
Section 10 - Engine - Chapter 2
95-15R
95-24
1
RD05K006
10-2-8
STEP 30
Move the right tank into position. Connect the
balance hose at the bottom of the tank (not shown)
and tighten the clamp. Connect the loose end of the
pressure equalization hose (not shown) to the top left
tank.
STEP 31
Install and tighten the two bolts on the hold-down
plate.
STEP 32
Install the batteries.
101R-23A
5-20
RD02B106

Advertisement

Table of Contents
loading

This manual is also suitable for:

T8020T8030T8040

Table of Contents